Patching - Technical Data

  • Lay out and mark all areas of repair.
  • Excavate areas to be repaired to a depth of 6”. Dispose of all debris offsite.
  • Square surface of repair and cut walls of repair to produce vertical edges.
  • Roll existing subgrade materials to achieve maximum density.
  • Mechanically apply liquid asphalt tack coat to all vertical edges of repair.
  • Install 6” of hot mix asphalt base course material.
  • Roll asphalt base course to achieve a true and firm finish matching existing grade.

 


 

 
 
 
What We've Done
What We Do
Request a Quote
 
 
Contact Us
Copyright © 2014 GMC Contractors, Inc. All Rights Reserved. Website by Patriot Media