| |
 |
| |
Paving - Technical Data
-
Lay out and mark area of overlay.
-
Where asphalt overlay adjoins existing surfaces, provide for a transition.
-
Clean overlay area of vegetation, dirt and surface debris as required. Dispose of all debris offsite.
-
Mechanically apply liquid asphalt tack coat to complete area of overlay.
-
Install asphalt leveling course material when needed to level any severely depressed areas.
-
Install 2” average depth of hot mix asphalt surface course material.
-
Roll surface course to achieve a true and firm finish.
-
Apply a seal of liquid asphalt, when necessary, to the adjoining edges
of the overlay to help prevent moisture penetration.

|
|
|
 |
|
|
|
|
|
|